Choose your connection path

Our goal is to connect your generation project safely and efficiently. Use the tabs below to choose the path that best matches how your system will operate.

< 150 kW

Small Microgeneration

For microgeneration projects under 150 kW designed to offset all or part of your home, farm or business electricity consumption. Common examples include residential solar and smaller farm or commercial rooftop systems.

  • Purpose: Size the system to offset some or all of your annual on-site electricity use.
  • Location: Install it on the consuming property, or adjacent property, that you own or lease.
  • Connection capacity: FortisAlberta confirms available capacity during its review. Capacity is not guaranteed and may change.

Apply online: Submit and track your Small Microgeneration application through PowerClerk.

Eligibility: FortisAlberta’s microgeneration processes comply with the Electric Utilities Act and the Microgeneration Regulation. The intent of microgeneration is to allow consumers to offset a portion or all of their electricity needs by generating electricity from renewable or alternative energy sources.

Important: Do not purchase or install generation equipment until FortisAlberta has reviewed and approved your project.

PCS update: Certified power control systems may support export-limited or non-export configurations. A PCS Commissioning Record and fail-safe verification are required.

Aggregated sites: If the same customer submits multiple Small Microgeneration applications, FortisAlberta reserves the right to assess them as an aggregated project. If the combined capacity is 150 kW or greater, the project may be subject to the Large Microgeneration process.

Resources 14 resources
150 to 4999 kW

Large Microgeneration

For larger microgeneration projects designed to offset all or part of a farm, commercial or industrial customer’s annual electricity consumption.

  • Purpose: Size the system to offset some or all of your annual on-site electricity use.
  • Location: Install it on the consuming property, or adjacent property, that you own or lease.

Project size: The maximum is the lesser of 4,999 kW or the customer service rating.

Eligibility: FortisAlberta’s microgeneration processes comply with the Electric Utilities Act and the Microgeneration Regulation. The intent of microgeneration is to allow consumers to offset a portion or all of their electricity needs by generating electricity from renewable or alternative energy sources.

⚠️ Key Things to Know Before You Start

  • Important: FortisAlberta recommends that you do not purchase or install generation equipment until FortisAlberta has completed the Detailed Level Study. After accepting the DLS and completing any necessary studies, confirm equipment requirements with your project team.
  • Interconnection capacity is not guaranteed and can change over time as other projects connect to the grid and system conditions change.
  • All projects must undergo engineering and technical reviews to ensure safe and reliable operation.
Large Microgeneration process at a glance
Stage 0Form A Intake

Submit the completed Form A and the supporting project information requested by FortisAlberta. The application is reviewed for completeness before the project advances.

Stage 1Capacity Check

FortisAlberta completes an initial capacity review and identifies possible feeder or system constraints. This check does not guarantee or reserve interconnection capacity.

Stage 2Detailed Level Study

The Detailed Level Study confirms interconnection requirements, required system modifications and any additional studies. After accepting the DLS and completing the identified studies, confirm equipment requirements with your project team.

Stage 3110-Day Package

Submit the engineering information and project documents identified for the 110-day milestone. Project-specific requirements are confirmed through the DLS and by the FortisAlberta project team.

Stage 430-Day Package

Submit the project information and documents identified for the 30-day milestone. Confirm the exact package requirements and due date with your FortisAlberta project contact.

Stage 5Commissioning Package

Provide the required commissioning documents, permits, inspection records and test results. Complete any project-specific commissioning and witnessing requirements before energization.

Stage 6Energization

FortisAlberta completes its final review and required metering work. Do not energize or export electricity until FortisAlberta provides the applicable written authorization.

Sample LMG project requirements (Gantt chart)

Use this sample schedule to understand the typical Large Microgeneration stages, submission milestones and project requirements. Actual timing and requirements are project-specific.

Resources 28 resources

Start here

DER Bulletin 2025-001 DER Interconnection Guide Customer Generator Options Table AUC Micro-Generation Notice Submission Guideline AUC Microgeneration FAQs Large Microgeneration Process – Sample Project Requirements Gantt Chart Large Microgeneration Presentation – February 19, 2026

Applications and authorization

Form A – Micro-generation Notice Third-Party Authorization – Micro-Generation DER Interconnection Package Checklist

Technical requirements and design

DER-02 – Technical Interconnection Requirements for All Three-Phase DER and Single-Phase DER 150 kW and Greater DER-02A – FortisAlberta Engineering Study Requirements DER-02B – FortisAlberta Effective Grounding Study Requirements DER-02C – Fast Frequency Response and Contingency Reserve Requirements DER-02D – ICAP Technical Requirements for DER 500 kVA and Greater DER-02E – ICAP Process Requirements for DER 500 kVA and Greater DER-02F – FortisAlberta Model Validation Requirements IEEE 1547-2018 – Interconnection and Interoperability of Distributed Energy Resources IEEE 1547.1-2020 – Conformance Test Procedures for DER Interconnection Equipment Alberta 1547-2018 – IEEE 1547-2018 Standard Adjustments for Alberta DER Inverter Configuration Template Customer Cable Request Form

Commissioning and completion

Interconnection Protection Settings & Commissioning (IPSC) FortisAlberta ICAP Certified Commissioning Engineer (CCE) resources and list

Ongoing maintenance

Maintenance Verification Report Sample – Maintenance Verification Report

Disputes and complaints

Notice of Dispute – Form B Notice of Complaint – Form C
Distribution-connected supply

Small Scale & Community Generation

For distribution-connected projects that supply electricity to the grid from renewable or alternative sources.

  • Community Generation: Includes projects that provide locally generated electricity for the benefit of participating community members.
  • Project size: Limited by distribution system capacity, typically up to 24 MW.
Small scale generation projects require both a small scale generation application and a High Level Study application as part of the DG process.
Resources 21 resources
Export-focused generation

Distributed & Commercial Generation

For commercial solar, wind, gas, storage and other projects that plan to export power onto the electrical system and do not qualify as microgeneration.

  • Exporting generation projects
  • Battery energy storage systems
  • Combined heat and power
  • Projects that may require AUC, AESO or TFO coordination
Resources 35 resources

Start here

DER Bulletin 2025-001 DER Interconnection Guide Customer Generator Options Table DER Pre-Application Appendix A - Fee Schedule Appendix C - Queue Management Practice

Regulatory and system coordination

Appendix B - AESO Interconnection and FortisAlberta FortisAlberta - Customer Confirmation of Lands re AESO SASR Submission Option M - Distributed Generation Section 101 Application Requirements

Applications and authorization

HLS Application (Download to complete the form) DLS Application (Download to complete the form) Third-Party Authorization Distributed Generation FortisAlberta - DER Interconnection Package Checklist

Technical requirements and studies

DER-02 - FortisAlberta Technical Interconnection Requirements for All Three Phase DER and Single-Phase DER 150 kW and Greater DER-02A - FortisAlberta Engineering Study Requirements DER-02B - FortisAlberta Effective Grounding Study Requirements DER-02C FortisAlberta Fast Frequency Response and Contingency Reserve Requirements DER-02D - FortisAlberta ICAP Technical Requirements for DER 500 kVA and Greater DER-02E - FortisAlberta ICAP Process Requirements for DER 500 kVA and Greater DER-02F - FortisAlberta Model Validation Requirements IEEE 1547-2018 - Interconnection and Interoperability of Distributed Energy Resources IEEE 1547.1-2020 - Conformance Test Procedures for DER Interconnection Equipment Alberta 1547-2018: IEEE 1547-2018 Standard Adjustments for the Province of Alberta, Canada DER IFC Data Requirements Customer Cable Request Form DER Inverter Configuration Template

Power quality

Power Quality Benchmark Compliance - Template V1.3 Power Quality Compliance - Example V1.3 DER sample PQ data

Commissioning and completion

Interconnection Protection Settings & Commissioning (IPSC) As-Built Generator Parameters FortisAlberta ICAP Certified Commissioning Engineer (CCE) resources and list

Ongoing maintenance

Maintenance Verification Report Sample - Maintenance Verification Report
Backup power only

Standby generation

For battery backup, portable generators, GenerLinks, fixed standby generators and critical service generators that provide power during utility outages and are not intended to export.

Closed transition systems must parallel the utility system for less than 100 milliseconds. Systems that parallel for more than 100 ms require the Distributed Generation process.
Resources 1 resource

Complete resources library
All generation documents, organized by connection pathway.

Open complete resources library

Hosting Capacity Map

Explore the estimated generation capacity available on FortisAlberta distribution feeders to help inform early project planning.

View Hosting Capacity Map

Need help choosing the right path?

FortisAlberta offers a pre-application consultation to provide information on the interconnection process. Contact FortisAlberta before submitting your application if you are unsure which process applies.

Small Microgeneration: microgen@fortisalberta.com
Large Microgeneration, Distributed Generation and Standby: Generation website or generation@fortisalberta.com
Phone: 310-WIRE (9473) or 1-855-310-WIRE (9473)